week 107
Was hoping to have finished this last Thursday, when Tuesday morning I suddenly found myself with almost no energy because of something that happened Monday night.
I have no control over the whole situation and rather not go into that here. Plus, I’m pretty sure everyone who follows me on Twitter, who follow this, want me to stfu about it.
The friend I’m doing this for said to take my times, so there is much less pressure on me. I want to be done with this soon, so I can give it to him and be finally done.
I’m having issues attaching the sides to the back. Once I’m past that, the rest will be a breeze.
I finished the pillow for my cousin. It’s really simple and I’m chuffed it looks pretty decent.
My sewing skills need more practice, at this point in time.
Progress on the shawl.
I’ve not finished up all the triangles, but started attaching each row.
To take a picture, I folded it in half. The second row down’s bits aren’t weaved in.
It looks a bit odd, but will look much better when it’s finished and blocked.
I had so much fun knitting The Knob House, that I’m knitting a second house.
I’m not doing it the same way as last time.
In case, anyone was wondering, I decided to go with Big Cartel for an online shop. Looks like I need to change the seller’s permit but I’m good with the other stuff. For the time being, it will be under my name. Need to call BOE tomorrow. It would be annoying if I have to completely fill out a new permit with everything the same except the name. I do like the other name but I’m tired of waiting. It’s hard but I need to have more faith in myself. I’ve been putting it off and it’s time. When it’s finally open, I’ll link to it in my About page.