weeks 307-308
I was not in the mental place to do much of anything, and was quite scatterbrained and exhausted, but before then and after, when it started wearing off at the tail end of the week.
Just a bit more knitting.

Was able to finish the back of the vest. From side to side it’s, if I remember right, is 25 inches/63.5cm. Vertically, it’s 18 inches/45.72cm.

Haven’t gotten far with one of the front panels. Not sure if I’ll get fancy with the fronts or not, but expect to have button packets added after they’re both nearly done.

The top project, I have no memory if I said anything about working on this sleeve but after dropping a stitch and count being off, it was frogged. First sleeve is finished, but it’s messed up in the ribbed rows. The bottom crochet bit hasn’t changed because I’m unsure how to add the second yarn.