week 250
I wasn’t project scattered over the past week. But, even with focus, things are not exact. I am not worried about running out of yarn for the rest of the main body, but not sure about the sleeves. It really depends on the sleeve length. Deep down, I feel it’s just the right amount.
This is what I have leftover after finishing two sections, after rewinding most of the cakes.
I wasn’t paying attention but managed to knit two rows less than I had planned. It oddly enough isn’t that huge of a difference between the sides. I’m going to make it so the two rows less are the front panels, and the normal amount are the back.
I wanted to finish this yesterday, but Saturday prevented me from doing anything as a migraine snuck up and made it impossible to do any bit of crafting. I only get migraines once every other month and for a while, they didn’t happen.
These are the two panels. Should have put more stitches on the holders but going to make the neck wider so when making a collar, I won’t have to worry about it being too small to work with.
I also need to get more stitch holders.
There will be vertical striped between all four panels, and under the sleeves. That part hasn’t been planned out.